UCD (University College Dublin)

Location: 
UCD (University College Dublin)
Client: 
UCD (University College Dublin)
Role: 
Works Contractor/Works Contractor and PSCS
Project Description: 

Make one unified space from numerous portioned spaces which had evolved over many projects. The project had a very small time frame and had to be completed within six weeks. The critical element of the project was to maintain a fire corridor by creating temporary fire walls during construction. Access to the library had to be maintained throughout the project. Health and Safety was important with a constantly moving canvas and continual public access required.

Portfolio Category: