Civic

UCD (University College Dublin)

Make one unified space from numerous portioned spaces which had evolved over many projects. The project had a very small time frame and had to be completed within six weeks. The critical element of the project was to maintain a fire corridor by creating temporary fire walls during construction. Access to the library had to be maintained throughout the project. Health and Safety was important with a constantly moving canvas and continual public access required.

Pages